Low cost carrier, Fastjet Zimbabwe has extended its flights suspension period from April 20, 2020, which was the proposed date for resuming operations.
In a travel update dated April 14, 2020, the airline revealed that flights will be resumed on May 2, 2020.
Fastjet temporarily suspended it operations from March 27, 2020 .
The suspension followed measures introduced in Zimbabwe and South Africa to control the spread of COVID-19.